Waterfront Projects
The Anacostia Waterfront revitalization integrates multiple transportation, land use and economic development projects within the area surrounding the Anacostia River. Please see below for a listing of these projects, as well as links to their project-specific sites.
Environmental Documents
- 11th Street Bridges Environmental Impact Statement (EIS)
- Anacostia Riverwalk Environmental Assessment
- South Capitol Street Environmental Impact Statement
Plans/Guidelines
- Anacostia 2032
- Anacostia Neighborhood Investment Plan
- Anacostia Transit Area Strategic Investment Plan
- Anacostia Waterfront Initiative
- Anacostia Waterfront Transportation Architecture Design Standards
- Anacostia Waterfront Transportation Master Plan
- Ballpark District
- Barry Farm/Park Chester/Wade Road Redevelopment Plan
- D.C. Comprehensive Plan
- Great Streets Framework Plan (14MB PDF)
- Hill East
- Kenilworth Parkside
- Poplar Point
- Southwest Waterfront
- Reservation 13/Hill East Draft Master Plan
- Washington Canal Park
Other Projects
- 14th Street Bridge Project and EIS
- Anacostia Metro Station
- Anacostia Riverwalk Trail
- Kingman Island
- Marvin Gaye Park
- Waterfront (Waterside Mall)
Other Studies
- Anacostia Access (South Capitol Street) Transportation Study
- Capitol Hill Transportation Study
- Kenilworth Avenue Corridor Transportation Study
- Middle Anacostia River Crossings Transportation Study
- Pennsylvania Avenue SE
- Pennsylvania Avenue SE Transportation Study
- South Capitol Street (Frederick Douglass Memorial) Bridge Alignment Study
- South Capitol Corridor Gateway and Anacostia Access Study
- Southwest Waterfront - Maine Avenue Study
- Water Taxi